It is basically a ‘cold mix’ asphalt laid and rectified at the surrounding outdoor temperature. Once the asphalt millings are laid perfectly, a steamroller is used to compact it to get the best finish. After getting it properly compacted, the surface will harden quickly within a few days.

Should you use driveway sealer on Millings?

Many homeowners can seal their new asphalt driveways by themselves, but asphalt millings are a little trickier. Since asphalt millings come in a wide variety of quality, you can’t always just dump a coat of sealcoat on and expect everything to work out.

Can asphalt millings go over gravel?

In short, yes, you can blacktop over gravel. To convert a gravel driveway to asphalt, there are a few steps that need to be followed, but the project can be completed relatively easily.

How do you pack down asphalt millings?

  1. Tamp down the surface of the asphalt with a hand tamper. Move across the entire area and use the tamper to hit every square inch with solid force to compact the layer of asphalt.
  2. Roll over the asphalt layer with a steam roller.
  3. Apply a commercial-grade asphalt seal-coat product, using a brush.

What size are asphalt millings?

One cubic yard of asphalt millings covers 80 square feet at 4″ thick. One yard of asphalt millings weighs 1.2 to 1.6 tons.

How much does a yard of millings cover?

80 square feet
One cubic yard of asphalt millings covers 80 square feet at 4″ thick.

Whats better asphalt millings or gravel?

The asphalt millings actually harden and form stronger bonds over time and they even produce less dust and dirt than gravel. Less dust means that vehicle owners who use the road or lot often won’t have to clean their trucks and cars as often as they might if only gravel was used.

How many yards is a ton of asphalt millings?

Calculate Asphalt Millings

Coverage (Square feet) 400 sq ft
Volume (Cubic feet) 67 cu ft
Volume (Cubic yards) 2.5 cu yd
Estimated amount (Pounds) 5,951 lb
Estimated amount (Tons) 2.98 ton