What are the regulations for shipboard incineration?

What are the regulations for shipboard incineration?

What are the regulations for shipboard incineration?

Regulation 16.6 generally requires that incinerators installed on ships constructed on or after 1 January 2000 or units which are installed on existing ships on or after that date are to Type Approved in accordance with resolution MEPC.

What is shipboard incinerator?

Incinerator is an important machinery on board which reduces the cost of waste disposal for ships. It is used to burn solid and liquid wastes produced on ships during normal operations and is also important for reducing overall waste from ships.

Which regulation of Annex VI does shipboard incineration belong?

– Regulation 16
Annex VI – Regulation 16 – Shipboard incineration.

What are the types of marine incinerators?

Vertical cyclone type and horizontal burner type are the two most commonly used incinerators on the ship.

Is installation of an incinerator mandatory?

The installation of an incinerator is not a mandatory requirement.

Can we run incinerator in ECA?

The use of an incinerator to incinerate sludge generated on board ship is permitted as allowed by regulation 16 of MARPOL Annex VI, including in the ECA.

How do you start a ship incinerator?

STARTING PROCEDURE

  1. OPEN MDO TO MAIN BURNER.
  2. SHUT RE-CIRCULATION VALVE TO WASTE OIL TANK TO PREVENT D.O GOING TO WASTE OIL TANK.
  3. SWITCH ON THE START BUTTON, FAN WILL START FOR PRE PURGING.
  4. CONTINUE PRE PURGING FOR 1-2 MIN.
  5. SWITCH ON THE MAIN BURNER TO CIRCULATE MDO THROUGH BURNER.
  6. SWITCH ON THE IGNITOR TO FIRE PILOT BURNER.

What is the purpose of International Safety management Code?

The purpose of the ISM Code is to provide an international standard for the safe management and operation of ships and for pollution prevention. The Assembly had already invited all Governments, by resolution A.

What is the 6 annex of MARPOL?

Annex VI of the MARPOL treaty is the main international treaty addressing air pollution prevention requirements from ships. It was implemented in the United States through the Act to Prevent Pollution from Ships, 33 U.S.C. ยงยง 1901-1905 (APPS).

How do you manually start an incinerator?

What is batch loaded incinerator?

Batch waste incinerators are loaded with waste through an open door which is then closed before the waste is ignited. The door remains closed until the ash residues remaining on the hearth have cooled and can be safely removed. The duration of a batch waste incinerator cycle is measured in hours.